Image Gallery

Keyword: Category: Tag: Sort By:
A Pressure cut-out switch is replaced on an MC-130 propeller at the Centralized Repair Facility, Hurlburt Field, Fla., Feb. 3, 2015. The Centralized Repair Facility is responsible for building and repairing T-56 engines and C-130 propellers. (U.S. Air Force photo Senior Airman Meagan Schutter/Released)


Prop shop Airmen get the engines running

A Pressure cut-out switch is replaced on an MC-130 propeller at the Centralized Repair Facility, Hurlburt Field, Fla., Feb. 3, 2015. The Centralized Repair Facility is responsible for building and repairing T-56 engines and C-130 propellers. (U.S. Air Force photo Senior Airman Meagan Schutter/Released)

Related Imagery
Senior Airman Meagan Schutter
150210-F-SN009-009.JPG

DOWNLOAD PHOTO
(1.7 MB)



Tags




< Back to Main Gallery